You have a older browser installed which may not display this site well

It would be best if you could obtain one of the newer more compliant and more secure browsers now available such as Firefox, IE8, Chrome or Safari.

Croatia

Attention: open in a new window. PDFPrintE-mail

Project Overview



No information for this section.

Post Project Review

This was a little different to other LIFT projects as it only lasted four days. Lorraine Moore from Shore Street Presbyterian church Donaghadee had been working with a local church.

Lorraine had asked us if we could draw plans for a proposed new church building, which we did and had sent out. Following this, local Christians asked if we could survey some land and look at what materials might be used in the construction of the church building.

So Greer Morrison, a man who has built a church, or, two in his time and Gary Moore travelled out to Croatia for a long weekend to give this church as mush help and advice as they could.

The site was surveyed and marked out and they visited builders yards advising on materials. Unfortunately the sale of the land has fallen through but this small Church is still determined to build in the future. It is our hope that the advice given to them by Greer and Gary will still be of help.


Project Gallery



A gallery of images photographed during this project:


Share/Save/Bookmark
English French German Italian Portuguese Russian Spanish

Search

Prayer News

Login Form